We reach videography studio around 2.30pm and collected the equipments needed from the IT Department.
The equipments we have used for that day, include:
1. Canon 650D DSLR
2. Canon EF 50mm F1.8
3. A tripod
4. Studio lights x3
Roles and positions of the day
1. Director - Redzuan
2. Make Up Artist & Video Editor- Jayis
3. Talent/Model aka the ai - Ching Huey
4. Cameraman- En Fung
After we reached the videography studio, Jayis started to do the make up for Ching Huey.
The theme for our make up is futuristic. After our discussion, we have decided to go for silver colour.
Image 1 below shows Jayis helping Ching Huey to do the make up
![]() |
| Image 1 |
Image 2 shows Redzuan checking the lights setup by En Fung.
![]() |
| Image 2 |
Image 3 shows Redzuan checking the lights to see if they are functioning.
![]() |
| Image 3 |
![]() |
| Image 4 |
Redzuan plugged in the cable for each studio light
![]() |
| Image 5 |
Ching Huey checking her make up
![]() |
| Image 6 |
While Ching Huey was still getting her make up done, Redzuan reposition the studio lights.
![]() |
| Image 7 |
Jayis reposition the lights to get the right lighting.
In this video shooting, one light was placed in front, two at the back were facing the wall to bounce the light from the wall.
![]() |
| Image 8 |
Jayis testing the camera
![]() |
| Image 9 |
Checking the colour of the video taken
![]() |
| Image 10 |
Redzuan setup the tripod
![]() |
| Image 11 |
Redzuan and Jayis discussing about the suitable height and angle to place the camera
![]() |
| Image 12 |
Jayis and Redzuan setting up the camera and tripod
![]() |
| Image 13 |
Jayis tested the focus of the lens
![]() |
| Image 14 |
Redzuan was sitting on the chair and feeling excited to start the video shoot
![]() |
| Image 15 |
Wrapping Ching Huey in-progress. Starting from the hand
![]() |
| Image 16 |
![]() |
| Image 17 |
![]() |
| Image 18 |
The shooting is only focus on the top part from the head to the shoulde
![]() |
| Image 19 |
![]() |
| Image 20 |
![]() |
| Image 21 |
Ching Huey listening to instructions carefully
![]() |
| Image 22 |
Jayis and the group checking the test version of the video taken
![]() |
| Image 23 |
![]() |
| Image 24 |
The final touch up before starting our videoshoot
![]() |
| Image 25 |
Redzuan, the director of the day, checking the storyline.
![]() |
| Image 26 |
![]() |
| Image 27 |
The video shooting ended around 5.30+ pm.
It was a wrap for that day and everyone worked really hard!
Go 4ttitude!!!



























No comments:
Post a Comment